ef5af8e6

5.2.12. Turbocharger

Removal

PERFORMANCE ORDER
1. Remove a final collector together with a turbocharger.
2. Unscrew bolts and remove exhaust section and laying from a turbocharger.
3. Unscrew bolts and remove an oil supply pipe.
4. Unscrew bolts and remove an oil return pipe.
5. Unscrew bolts and remove a turbocharger with a collector.

Installation

Installation is made in the sequence, the return to removal.

HEAT EXCHANGER

PERFORMANCE ORDER
1. Remove a radiator.
2. Unscrew bolts and remove the heat exchanger from lateral face of a radiator.
3. Installation is made in the sequence, the return to removal.