ef5af8e6

5.2.14. Final collector

Removal

PERFORMANCE ORDER
1. Remove a weight wire from the accumulator.
2. Unscrew screws and remove a plastic casing from the top part of a head of the block of cylinders.
3. Remove an air supply pipe from a casing of the air filter and remove the metal pipe connecting a turbocharger to the heat exchanger.
4. Unscrew nuts (A) of fastening and remove wires (V) of giving of tension from incandescence candles.
5. Unscrew screws of fastening of the heat-resistant screen.
6. Remove the heat-resistant screen from the top part of a collector.
7. Unscrew the nuts fixing a reception exhaust pipe to a collector and move a pipe from a collector.
8. Under the car unscrew bolts and remove the heat-resistant screen of a starter.
9. Unscrew bolts and remove a guide of a plait of wires from a back part of the block of cylinders.
10. Unscrew oil pipes of a turbocharger from the block of cylinders.
11. Unscrew bolts and remove an arm, supports of a collector.
12. Disconnect a vacuum hose from a turbocharger gate diaphragm.
13. Evenly and in the diagonal sequence unscrew nuts of fastening of a final collector.
14. Remove a final collector together with a turbocharger.
15. Remove laying of a final collector.

Installation

PERFORMANCE ORDER
1. Installation is made in the sequence, the return to removal, taking into account the next moments.
2. Replace all laying.
3. Check and, if necessary, add engine oil and cooling liquid.
4. At the first start the engine has to work several minutes at single turns therefore oil will arrive to turbocharger bearings.