12:24. Steering mechanism
MODELS WITH THE 4-CYLINDER ENGINE
Removal
PERFORMANCE ORDER |
1. Establish forward wheels directly. |
2. Mark position of the steering lever in relation to the steering mechanism. Turn off a fixing nut and remove the lever from an axis by means of a stripper. |
3. Remove the finishing panel under an instrument guard. |
4. Turn off a coupling bolt of the lower fastening of a steering column and disconnect a shaft of a steering column from the steering mechanism. |
5. Turn off nuts of connections and disconnect hydraulic tubes from the steering mechanism. |
6. Turn off fixing bolts and nuts and remove the steering mechanism. |
|
Installation
Installation is carried out to the sequences, the return to removal.
MODELS WITH THE 6-CYLINDER ENGINE
Removal
PERFORMANCE ORDER |
1. Establish forward wheels directly. |
2. Mark position of the steering lever in relation to the steering mechanism. Turn off a fixing nut and remove the lever from an axis by means of a stripper. |
3. Turn off fixing bolts and remove filters from the steering mechanism. |
4. Disconnect the socket of connection of the steering mechanism. |
5. Remove a damper on the right side of the engine and turn off the nut fixing the right fixing block of the engine to a body. |
6. Close the lock of a steering column to prevent rotation of a steering wheel. |
7. Disconnect a vacuum hose from the vacuum amplifier of brakes. |
8. Release pressure from a power supply system and disconnect fuel tubes from an inlet collector. |
9. Remove a tank of cooling liquid. |
10. Disconnect hoses from the coal filter. |
|
11. Mark and disconnect hydraulic tubes (are specified by shooters) from the steering mechanism. |
12. Remove the finishing panel under an instrument guard. |
13. Turn off a coupling bolt of the lower fastening of a steering column and disconnect a shaft of a steering column from the steering mechanism. |
14. Install the elevator and raise the right side of the engine approximately on 3 cm. |
15. Remove a starter. |
|
16. Turn off fixing bolts (are specified by shooters) and nuts and remove the steering mechanism. |
|
Installation
Installation is carried out to the sequences, the return to removal.