3.4.13. The first start of the engine after a partition
Prevention
Before the first launch of the engine you keep in readiness the fire extinguisher.
PERFORMANCE ORDER |
1. After the end of assembly of the engine check the level of oil and cooling liquid twice. |
2. By the turned-out candlelight and the disconnected systems of ignition and the fuel pump turn a bent shaft until registration of pressure of oil the sensor or before blackout of a control lamp of pressure of oil. |
3. Screw candles, dress tips of high-voltage wires and include system of ignition and the fuel pump. |
4. Start the engine. The engine has to be started immediately, later the short period necessary for increase of pressure in fuel system. |
5. After start-up warm up the engine up to the working temperature. In process of a warming up of the engine you watch closely emergence of leaks of oil or cooling liquid. |
6. Stop the engine and check levels of oil and cooling liquid. |
7. Make a trip in the place with low-heavy traffic, accelerate the car from the speed of 50 km/h to 90 km/h, then release a pedal of a butterfly valve, having slowed down the car the engine to the speed of 50 km/h. Repeat the cycle of 10-12 times. At the same time occurs extra earnings of piston rings to walls of cylinders. Double-check levels of oil and cooling liquid. |
8. Make a trip on 900 km, without subjecting the engine to big loadings (move at a low speed), periodically checking oil level. In the period of a running in the raised oil consumption is possible. |
9. After the run of 900-1100 km replace oil and an oil filter. |
10. At a run of the subsequent several hundred kilometers conduct the car in the normal mode, avoiding too big and too small loadings. |
11. Later 3600 km of a run replace again oil and an oil filter then the engine is considered passed a running in. |
|